How Many Hours Have You Bought?

Loading

If 900 people can build and operate a global product portfolio generating €2.65 billion in annual revenue, what exactly does it mean when another organization says it has ”a product development portfolio with 10,000 FTE capacity”?

Many organizations equate product development capacity with the total time of full-time employees/consultants, often referred to as FTE/FTC capacity. In reality, the number of people in an organization is a poor proxy for its ability to deliver on customer needs. It’s like measuring the quality of a book by its number of letters.

This is even more true when it comes to products consisting primarily of software because the cost of reproducing it is basically zero. There is little to no additional development effort needed to produce the next million copies. Copying software is literally as easy as hitting Ctrl-C.

Three types of capacity and how they are connected

When I learned from using Ideal Manhours

Many years ago I was responsible for a pilot project where we set out to use Scrum as the basis for next-generation radio base station software. A key reason for doing this was that we found too many unknowns when trying to estimate the time and effort required for the complete project. Some of the complications were preliminary mobile network standards, custom hardware not yet developed, functionality expected to be changed, and so on.

So, instead of waiting for all uncertainties to be removed, we decided to start development work knowing that one of the core elements of it had to be the ability to learn and adapt both how we worked in the project and the product itself.

We started by establishing three software development teams consisting of seven people from different departments in the organization, and learned the basics of Scrum by reading the Scrum Guide and watching videos by Ken Schwaber (one of its founders). We learned that we should break down work into smaller stories. We also encountered the common practice of estimating them using something called story points. Being all engineers we had problems accepting the Story point concept as it wasn’t tied to anything physical. It felt too vague and fluffy to use, so instead we came up with the unit ”Ideal manhours”. It was basically an answer to the question ”If I had uninterrupted time to work on this Story, how long would it take me?”.

At the time, ”Ideal manhours” seemed like a great way of estimating work so that we could make a reasonable plan for the coming sprint, as well as make a forecast of the number of sprints remaining to complete the defined stories in our backlog.

I’ve since learned several reasons why this seemingly logical approach was leading to nowhere.

First, it assumes that each story represents a fixed amount of work. It doesn’t account for dependencies on other work, the skills required, or the tools and environments needed.

Secondly, it does not facilitate learning once the story has been completed. If the actual time spent on the story was 100 hours and estimation of ideal manhours was 65 — what does it tell you? How would you use that information for the next sprint? Suppose the next story is estimated at 80 ideal hours. Should you adjust that to 123 hours because the previous story took 54% longer?

Thirdly, and arguably most importantly, it is fundamentally an individual estimate. My ideal manhours will be different from yours. Estimation by individuals tends to lead to the work being done by the same individual who did the original estimate. That is problematic because creating valuable products often requires cross-disciplinary collaboration and teamwork rather than individual execution.

We had replaced one questionable unit of capacity, FTE hours, with another: Ideal manhours.

The same problem exists at the Portfolio level

Over the last decade I’ve observed the same phenomenon occurring on the product portfolio management level. Development projects are simplified into a financial figure that hides what really stands in the way of delivering value to customers. Instead of shining a spotlight on key bottlenecks, it hides them behind numbers. A €10 million development initiative doesn’t tell us whether the constraint is engineering capacity, architecture, supplier, tooling, decision-making, or something else entirely.

What seems like a reasonable question, ”what would it cost to develop this capability?”, becomes a costly exercise to produce a precise-looking number built on a very weak foundation. To arrive at a number, assumptions have to be made about both how the solution will be developed and what the solution itself will look like. But these assumptions are often made before development has even begun, when very little is known about either.

The problem is not that estimates are always inaccurate. However, we tend to treat an estimate as if it were a property of the work itself, but the truth is that it isn’t. It is a hypothesis based on what we know at a particular point in time. Only after the work is complete do we know what it actually required.

What should be measured instead?

So, if resource capacity is a poor proxy for development capacity, what should we measure instead?

It might be logical to shift towards measuring value delivery. The challenge is that customer value is often a lagging indicator. For product development, the outcome of development work may not be visible until long after the work has been completed.

Development capacity however is something we can observe during product development. It can help us understand whether we have a reasonable development load in the system, support forecasting, and reveal systemic impediments.

Circling back to the initial question — what does ”10,000 FTE capacity” tell you?

It tells you how many hours you have bought, but it does not tell you how much value you can deliver to your customers. The numbers in the opening are real. Supercell reported €2.65 billion revenue in 2025 with a year-end workforce of about 900 people.